Nichapie
Road Under Construction

Horn of Africa Gateway Development Project (HoAGDP) - Isiolo-Wajir-Mandera Highway

Garissa Kenya

Kenya's longest single road project since independence: 750km highway from Isiolo through Garissa, Wajir to Mandera. Multiple lots including Kulamawe-Modogashe (127km), Modogashe-Habaswein-Samatar (68km), Wajir-Tarbaj (57km), Tarbaj-Kotulo (64km), Kotulo-Kobo-El Wak (64km).

Description

Kenya's longest single road project since independence: 750km highway from Isiolo through Garissa, Wajir to Mandera. Multiple lots including Kulamawe-Modogashe (127km), Modogashe-Habaswein-Samatar (68km), Wajir-Tarbaj (57km), Tarbaj-Kotulo (64km), Kotulo-Kobo-El Wak (64km). Includes 748km fibre optic cable for ICT connectivity. 40% complete as of Feb 2025. Also includes Garissa-Dadaab-Liboi-Harhar road (211km). Social infrastructure: KES 3.7B for CSR including Modogashe water project (KES 300M from Merti Aquifer). Connects Kenya to Somalia and Ethiopia. President Ruto inspected Kula Mawe-Modogashe section Feb 2025.