Multiple road lots under HoAGDP covering Wajir County. Wajir-Tarbaj (A13) road and spur road (57km) with axle load control station and 124km fibre optic cable along Samatar-Wajir-Tarbaj section. Tarbaj-Kotulo (A13) road with 64km fibre optic cable (crosses into Mandera County). Connects Wajir to Mandera and broader Isiolo-Mandera corridor. Part of Mombasa-Garissa-Wajir-Mandera-Mogadishu road corridor for regional trade.
Wajir-Tarbaj-Mandera Road and Fibre Optic (A13 HoAGDP)
Multiple road lots under HoAGDP covering Wajir County. Wajir-Tarbaj (A13) road and spur road (57km) with axle load control station and 124km fibre optic cable along Samatar-Wajir-Tarbaj section. Tarbaj-Kotulo (A13) road with 64km fibre optic cable (crosses into Mandera County).